When a power transformer operates with abnormal temperature, the principle of "first determine the cause, then handle it by grade, and finally shut down for inspection" should be followed. The priority is to ensure the safety of the equipment and prevent the fault from expanding.
Step 1: Quickly determine the type and cause of the anomaly
Step 2: Emergency Cooling Measures for Slight Over-temperature
Reduce the load gradually to lower the operating current and heat loss.
Fully put into operation all cooling equipment manually.
Remove sundries on radiators and strengthen ventilation and sunshade.
Increase inspection frequency and continuously monitor temperature changes.
Step 3: Classified Shutdown Control
Reduce load and operate within a limited time
Top oil temperature exceeds 85°C or winding temperature exceeds 95°C.
Partial failure of the cooling system and insufficient heat dissipation.
Continuous and rapid temperature rise.
Immediate power outage and emergency shutdown
Shut down the transformer immediately and report to the dispatching department if any of the following occurs:
Step 4: Inspection and Restoration after Shutdown
After the equipment is shut down, it is necessary to conduct a comprehensive inspection in collaboration with professional personnel: