How to Install the Grounding Electrode for a DFW Low-Voltage Branch Box

2026-11-27 0 Leave me a message


I. Pre-Installation Preparations

1. Technical Preparations

Prior to construction, a drawing review meeting must be conducted, focusing on verifying the design parameters of the grounding system, including grounding electrode specifications, burial depth requirements, and target grounding resistance values. Additionally, specialized technical briefing documents must be prepared to ensure that workers clearly understand the process standards and safety requirements.


2. Material Selection

Grounding electrode materials must possess good electrical conductivity and corrosion resistance. Common material specifications are as follows:

  • Grounding electrode body: Hot-dip galvanized angle steel (∠50×50×5 mm) or galvanized steel pipe (Φ50 mm, wall thickness ≥3.5 mm), typically 2.5 m in length
  • Grounding trunk line: 40×4 mm galvanized flat steel or copper-core conductor with a cross-sectional area of ≥16 mm²
  • Connectors: M10×30 mm stainless steel bolts with anti-loosening washers
  • Anti-corrosion coating: Epoxy zinc-rich primer
  • Resistance-reducing agent (if necessary): Physical-type long-lasting resistance-reducing agent with a pH of 7–9, free of components that corrode metal


In coastal or humid areas, it is recommended to use copper-clad steel grounding electrodes to enhance corrosion resistance. The use of rebar as grounding electrode material is strictly prohibited, as its ribbed surface can easily cause tip-concentrated discharge and it corrodes rapidly.


3. Equipment Preparation

The main construction equipment includes: an electric hammer drill (≥1200 W), hydraulic pliers, a digital ground resistance tester (resolution 0.01 Ω), an arc welder, exothermic welding molds, etc.


II. Selection of Grounding Electrode Location

The selection of the grounding electrode location directly affects the effectiveness of the grounding system and the convenience of future maintenance. The following principles should be followed:

  • Distance from the distribution box: The horizontal distance should be 1.2 to 1.5 m to facilitate connection to the grounding busbar.
  • Distance from buildings: The distance from the exterior walls or foundation of a building should be no less than 1.5 m to prevent damage to the waterproofing layer during maintenance.
  • Avoid underground utilities: Keep a safe distance from underground utilities such as cable trenches, water supply and drainage pipes, and gas lines
  • Soil conditions: Prioritize areas with moist soil and low resistivity; avoid landfill sites, slag areas, and highly corrosive soils
  • Avoid pedestrian walkways: Do not install in areas with high foot traffic, such as sidewalks and building entrances


III. Grounding Electrode Construction Procedures

1. Excavation of Grounding Trench

A combination of mechanical excavation and manual finishing is used. The dimensions of the main grounding trench are generally 500 mm wide by 800 mm deep. The trench bottom must be leveled and compacted; if rocky strata are encountered, they should be backfilled with fine soil (thickness ≥ 300 mm). Backfill soil must be free of foreign materials such as rocks and construction debris; soil sourced from outside the site must not be highly corrosive.


2. Driving in Grounding Electrodes

Requirements for the burial depth of a single electrode:

Soil Type
Depth from Ground Surface to Top
Remarks
Ordinary Clay
≥0.6 m
Standard conditions
Gravel    
≥1.0 m
Requires replacement with clay and addition of a resistance-reducing agent
Corrosive Soil
≥1.2 m
Use copper-clad steel or thickened galvanized steel


Key Points for Driving:

  • The grounding electrode should be driven vertically; use a plumb bob to monitor the angle in real time during the driving process, keeping the inclination within 2%
  • The lower end of angle steel must be tapered; the lower end of steel pipe must be shaped into a point, or round bar must be flattened before being driven vertically
  • The top of the grounding electrode must be buried to a depth of at least 0.6 m and must be below the local frost line
  • The top of the electrode must be sawed flat and chamfered, with the connection hole surface exposed by ≥50 mm; zinc nodules must be removed


3. Arrangement of Multiple Grounding Electrodes

When a single grounding electrode cannot meet the resistance requirements, multiple grounding electrodes must be installed:

  • Spacing requirements: The spacing between vertical grounding electrodes should not be less than twice their length (generally ≥5 m); the spacing between horizontal grounding electrodes should not be less than 5 m
  • Connection Method: Adjacent grounding electrodes shall be connected by welding using 40×4 mm galvanized flat steel to form a closed loop configuration
  • Minimum Number: There shall be no fewer than two vertical grounding electrodes


4. Welding and Connections

The connection between grounding conductors and grounding electrodes shall be made using lap welding; the quality of the weld directly determines the reliability of the grounding system:

  • Flat steel lap joint: The weld length shall be ≥ twice the width of the flat steel, and at least three edges shall be welded
  • Round bar lap joint: The weld length must be ≥ 6 times the diameter of the round bar, with welding performed on both sides
  • Welding of flat steel to round bar (or angle steel): In addition to welding on both sides of the contact area, an arc-shaped clamp formed from steel strip must be welded in place, or the steel strip must be bent into an arc and welded directly to the steel pipe (or angle steel)

Weld treatment: The weld height must be ≥ 4 mm; after welding, remove slag and apply anti-corrosion treatment


5. Enclosure Grounding Connections

Special attention must be paid to the connection between the grounding busbar and the DFW low-voltage branch box:

  • The grounding busbar must be reliably connected to the enclosure’s grounding terminal and the cable shielding.
  • Use two or more conductors to establish electrical connections to the grounding electrode at different points to ensure reliable grounding.
  • The grounding of each electrical device must be connected to the grounding busbar via a separate grounding wire; series grounding is strictly prohibited
  • The metal enclosure door and the enclosure body must be bonded using a yellow-green flexible copper braided wire
  • Connections must be treated with corrosion protection, and “PE” labels and yellow-green striped markings (spaced 100 mm apart) must be affixed

6. Corrosion Protection

  • Apply two coats of zinc-rich epoxy paint to welds and the surrounding 100 mm area, then cover with 0.2 mm heat-shrink tubing
  • Coat underground sections with asphalt or epoxy resin for corrosion protection
  • Paint above-ground grounding flat steel with yellow-green markings (spaced 10 cm apart)
  • Reapply anti-corrosion paint to bolted connections on galvanized flat steel lead-out wires


IV. Ground Resistance Testing and Acceptance

1. Resistance Testing

After installation is complete, actual measurements must be taken using a ground resistance tester:

  • Acceptance criteria: Ground resistance of an independent grounding electrode for a low-voltage system ≤ 4 Ω; if shared with a lightning protection grounding system, then ≤ 1 Ω
  • Test Method: Measure using the three-electrode method; perform one test during the dry season and one during the rainy season, and use the maximum value
  • Test Instrument: Digital ground resistance tester (range 0–100 Ω, accuracy ±1%)


2. Corrective Actions for Excessive Resistance

If the measured resistance value exceeds the standard, the following measures may be taken:

  • Increase the number of grounding electrodes
  • Increase the burial depth of the grounding electrodes
  • Incorporate low-resistivity materials such as charcoal or coke around the grounding electrodes
  • Use long-lasting chemical resistivity reducers, which can lower soil resistivity to 40% of its original value
  • Replace the soil with low-resistivity soil (such as moist clay)


3. Acceptance Inspection

During acceptance, the following inspections shall be conducted and relevant documentation submitted:

  • All exposed portions of the grounding grid are securely connected; grounding conductors are of the correct specifications; paint is intact; and markings are complete and clearly visible
  • Grounding resistance test records meet requirements
  • Inspection records for concealed work are complete
  • Certificates of material conformity and third-party test reports are complete


V. Safety Precautions

1. Before installation, ensure that the upstream switch is turned off and verify that the circuit is de-energized; operators must wear insulated protective gear.

2. Do not perform outdoor work in rainy weather; the ambient temperature must be ≥5°C, and relative humidity must be ≤85%.

3. Set up barriers and warning signs at the site; illuminance during nighttime work must be ≥50 lx.

4. Inspect grounding connection points at least once a year for corrosion or looseness; recheck grounding resistance after rainfall.

5. Install sturdy protective sleeves, such as steel pipes, where grounding wires pass through walls or floors.

6. Install expansion joints when grounding wires cross building expansion joints or settlement joints (the grounding wire itself may be bent into an arc to serve as a substitute).


VI. Summary

The installation of grounding electrodes for DFW low-voltage branch boxes is a systematic project involving multiple stages, including material selection, location planning, construction techniques, and testing and acceptance. The key points can be summarized as follows: burial depth ≥ 0.6 m, spacing ≥ 5 m, welding specifications, independent connections, and resistance ≤ 4 Ω. Only by strictly adhering to the specifications during construction can the long-term reliable operation of the grounding system be ensured, providing a solid foundation for the safety and stability of the distribution network.